Cryotherapy

Planning a Cryotherapy Suite: Space, Power and Installation Requirements

November 2026

Planning a cryotherapy installation involves more than choosing a chamber. Explore the room, access, electrical and service requirements to consider before work begins.

POWERCAB STORM cryotherapy chamber in a bright installation room

Adding whole-body cryotherapy to a clinic, gym, hotel spa or recovery centre takes more than choosing a chamber. The room, electrical supply, access route and surrounding services all need to be considered before installation.

Planning these details early helps your team assess whether a space is suitable, identify any building work and avoid delays later in the project.

Start with the room

The room needs to maintain suitable conditions for the equipment to operate. For POWERCAB models, the manufacturer’s installation guidance specifies a room temperature below 23°C and humidity below 35%, with air conditioning and dehumidification requirements varying by model. The POWERCAB STORM is air-cooled and does not require a separate chiller unit.

It’s also important to plan space around the chamber for installation, servicing and day-to-day use. The manufacturer’s guidance for the STORM specifies at least 800 mm behind the unit and 1,000 mm to the side by the door. Other models have their own layout requirements, so the room plan should be checked against the specification for the model you select.

Check the access route

Before delivery, measure the full route from the unloading point to the installation room. Include doorways, corridors, lifts, turns and any changes in floor level—not just the final room entrance.

The manufacturer’s installation guidance lists a minimum doorway width of 850 mm and a minimum ceiling height of 2.5 m for the models covered in its brochure. It also lists different unit weights by model, so confirm the floor’s load capacity and the delivery route with the project team before ordering.

Plan the electrical supply

POWERCAB models require a suitable electrical connection. The manufacturer’s brochure specifies a 400 V, 16 A supply for the LIGHT and STORM, and two such connections for the PRO. Maximum power requirements also vary by model. A qualified electrician should review the planned installation and confirm the supply, circuit protection and connection point before work begins.

Client using the POWERCAB chamber during a cryotherapy session

Allow for ventilation, data and services

The selected model may need additional provisions around the chamber. These can include network access, space for ventilation or exhaust arrangements, and—on some models—connections for a separate cooling unit. The STORM brochure, for example, lists a LAN connection and an optional exhaust provision behind the unit.

These details are easiest to coordinate while the room layout and electrical plans are still being developed.

Build the installation into your project plan

A site review should bring together the room layout, access measurements, floor capacity, electrical supply and any required environmental controls. It’s also a good time to consider how clients and staff will move through the space, where the chamber will sit in relation to other services, and how the room will fit the look and operation of your facility.

The exact requirements depend on the POWERCAB model and configuration. Use the current model-specific installation documentation and have the relevant building and electrical professionals confirm the site before work starts.

Planning a Cryotherapy Installation in Ireland?

B WELL Systems can help Irish clinics, gyms, hotels and recovery centres explore POWERCAB options and plan the next steps for their space. Get in touch to discuss your project or arrange a site review.

Ireland only

POWERCAB is available through B WELL SYSTEMS in Ireland only. B WELL SYSTEMS cannot supply or distribute POWERCAB in the UK.